The Overview tab is the first thing you see when you open a project. It’s a glance-level summary — for deeper edits, jump to the relevant tab.Documentation Index
Fetch the complete documentation index at: https://docs.streampixel.io/llms.txt
Use this file to discover all available pages before exploring further.
What’s on the page
| Section | What it shows |
|---|---|
| Live Users | Viewers currently streaming. |
| In Queue | Viewers waiting for a worker. |
| Region | The project’s region (with a switcher icon if you have permission). |
| Status | Healthy, locked, paused, or error. |
| Share Link | One-click copy of the project’s share URL. Each viewer who opens it consumes 1 CCU. |
| Live Build | The currently active build, with UE version and upload date. Buttons to view all builds or upload a new one. |
| CCU Allocation | This project’s Fixed or Dynamic CCU, plus shared pool availability. |
| Health Warnings | Banners for problems — no live build, too many old builds, project locked. |
Status states
The Status card on Overview reflects whether the project is currently reachable. The Project On / Off toggle in the project header controls this directly.| State | Meaning |
|---|---|
| Online | Project is on and ready to stream. |
| Offline | Project is turned off via the Project On/Off toggle in the header. Share links return an error until you turn it back on. |
| Locked | Account is over its project slot limit. Either delete a project or add slots. |
| Paused | Project is temporarily disabled (Owner action). |
Common actions from this tab
- Copy the share link — paste into emails, embed in your site.
- Transfer to another region — see Transferring a project to another region below.
- Upload a new build — jumps to the Builds tab with the upload dialog open.
- Resolve health warnings — banners link directly to the action that fixes them.
Transferring a project to another region
If your audience shifts geographically — or you want to test a different region’s latency — you can move a project between regions without re-uploading.Click the transfer icon next to the project's region
On the Region card on the Overview tab, click the transfer icon beside the region name.
Pick the target region
Select the destination from the dropdown. Only regions you have access to are listed.
Other tabs
Next
Capacity & CCU
Allocate CCU between Fixed and Dynamic across projects.
Builds
Upload and manage builds.