Skip to main content

Documentation Index

Fetch the complete documentation index at: https://docs.streampixel.io/llms.txt

Use this file to discover all available pages before exploring further.

The Overview tab is the first thing you see when you open a project. It’s a glance-level summary — for deeper edits, jump to the relevant tab.
Project Overview tab showing live users, queue, region with transfer icon, status, share link, live build, CCU allocation, and health warnings.

What’s on the page

SectionWhat it shows
Live UsersViewers currently streaming.
In QueueViewers waiting for a worker.
RegionThe project’s region (with a switcher icon if you have permission).
StatusHealthy, locked, paused, or error.
Share LinkOne-click copy of the project’s share URL. Each viewer who opens it consumes 1 CCU.
Live BuildThe currently active build, with UE version and upload date. Buttons to view all builds or upload a new one.
CCU AllocationThis project’s Fixed or Dynamic CCU, plus shared pool availability.
Health WarningsBanners for problems — no live build, too many old builds, project locked.

Status states

The Status card on Overview reflects whether the project is currently reachable. The Project On / Off toggle in the project header controls this directly.
StateMeaning
OnlineProject is on and ready to stream.
OfflineProject is turned off via the Project On/Off toggle in the header. Share links return an error until you turn it back on.
LockedAccount is over its project slot limit. Either delete a project or add slots.
PausedProject is temporarily disabled (Owner action).

Common actions from this tab

  • Copy the share link — paste into emails, embed in your site.
  • Transfer to another region — see Transferring a project to another region below.
  • Upload a new build — jumps to the Builds tab with the upload dialog open.
  • Resolve health warnings — banners link directly to the action that fixes them.

Transferring a project to another region

If your audience shifts geographically — or you want to test a different region’s latency — you can move a project between regions without re-uploading.
1

Click the transfer icon next to the project's region

On the Region card on the Overview tab, click the transfer icon beside the region name.
2

Pick the target region

Select the destination from the dropdown. Only regions you have access to are listed.
3

Confirm the transfer

The project starts moving. The build, settings, and share link all carry over — viewers don’t need a new URL.
The project is disabled during the transfer and won’t be accessible. Live sessions end immediately, the share link returns an error, and viewers cannot connect until the transfer completes. Plan transfers during a low-traffic window. Larger projects (close to or over the 24 GB build cap) take longer.
For a list of regions and which is best for which audience, see Regions.

Other tabs

TabWhat it does
BuildsUpload, manage, and set the live build.
SharingShare link and meeting rooms.
BrandingLogo, splash, loading messages.
SettingsSecurity, session rules, input, codec, communication.
AnalyticsPer-project session metrics.

Next

Capacity & CCU

Allocate CCU between Fixed and Dynamic across projects.

Builds

Upload and manage builds.